Students:
| George Taylor, CPE | Jim McNally, CE | Piotr Stanczyk, BMTM |
| Grace Nijm, CPE | Halil Sylejmani, CPE | Daniel Olejouvz, BMTM |
| Richard Monteverde, ME | Jermaine Ealy, BMTM | Chris Koniecko, BMTM |
| Scott Larson, BMTM | Maciej Franaik, BMTM | Scott Jones, EE |
Faculty:
Dr. Dan Tomal, Associate Director and Adjunct Faculty, Manufacturing Technology
and Management
Dr. Keith McKee, Director of Manufacturing Technology and Management
Dr. Bob Carlson,
Associate Dean and Director of the Center for Professional
Development
Project:
To design a software program that contains a matrix of risk and preventive
factors that assess how well an organization meets Homeland Security Guidelines
aimed at preventing terrorist attacks, reducing the vulnerability to terrorism
and minimizing the damage from potential attacks and natural disasters.
Outcome:
This Inter-Professional Project (IPRO) group created an assessment tool that
consists of questions that assess the risk of a facility. The questions are
divided into four main categories: Technological, Structural/Utilities, Criminal/Terrorist,
and Environmental. The project used the questions to create a computer program
that would interactively use the questions to assess the safety and security
risks of a facility. An individual score for each of the four major categories
and an overall score would then be reported.
In determining a final score for the risk assessment, weights were assigned to the questions. To facilitate straightforward scoring, all questions are structured in a format of only two possible answers per question: yes or no (to simplify the scoring procedure). By adding weights for the questions based upon the type of facility, the result of the risk assessment is better tailored to fit individual cases and consequently is more applicable to the user.
To further improve this assessment, additional questions are added based on
the type of facility, such as whether the facility was a government building,
academic institution, etc. By narrowing down more of the specifics of the facility
in question, the program can be tailored to ask more case-specific questions.
Finally, the group included explanations along with the questions. These explanations
are present to inform the user of why the question and the issue addressed
are important. For the final software product, the user is provided with explanations
of where the facility's shortcomings may exist along with the final risk assessment
score.
The project tied for first place as the best IPRO.